  • Xekong 4A and 4B Hydroelectric Power Project

    Table of Key Parameters for Steel Bridge Projects

    No. 1 2
    Bridge Name 1# Temporary Steel Bridge (4A) 1# Temporary Steel Bridge (4B)
    Bridge Type and Model ZB200 Prefabricated Steel Highway Bridge ZB200 Prefabricated Steel Highway Bridge
    Total Bridge Length (m) 277.796 166.324
    Design Live Load (t) 55 55
    Key Features Handle the cross-river transport of heavy equipment and bulk construction materials for the power plant construction site, ensure access for the main construction work, and serve as an emergency passageway during the flood season. Improve the site’s cross-river transportation network to cover the power plant construction area and meet the routine heavy-load construction traffic needs.
    Location Ban songkhone, Mueang Lamam  Xekong Province LAO PDR.---4A Ban songkhone, Mueang Lamam  Xekong Province LAO PDR.---4B
    Project Name Xekong 4A and 4B Hydroelectric Power Project Xekong 4A and 4B Hydroelectric Power Project
    Start-to-Completion Time March 2026–August 2026 March 2026–August 2026

     