FAQ

HOME / FAQ

  • Where is your factory located?

    Our factory is located at No. 19, Xingye Road, Shangdang Town, Dantu District,Zhenjiang City, Jiangsu Province, China

    +
  • What is the average delivery time?

    Average delivery time is 30-35 days.

    +
  • How long does it take to receive a response after we send you a quote request?

    We will respond within 24 hours of receiving your quote request on business days.

    +
  • What are the payment methods?

    When providing a quote, we will confirm the transaction method with you.

    +
  • What models of Bailey bridges do you supply?

    We supply Model 321 and Model 200 Bailey bridges, as well as a full set of accessories: Bailey trusses, crossbeams, bridge decks, Bailey pins, wind bracing, and stiffening chords, among others. Custom designs are available.

    +
  • What are the maximum span and load-bearing capacity of the Bailey bridges?

    The maximum single-span length is 60 meters. The load-bearing capacity can be customized according to the project to accommodate light vehicles, heavy trucks, and construction machinery.

    +
  • What are the options for surface corrosion protection?

    We offer paint coating or hot-dip galvanizing. Hot-dip galvanizing is suitable for coastal, high-humidity, and highly corrosive environments and offers a longer service life.

    +
  • Can you provide drawings and installation instructions?

    We can provide a complete set of engineering drawings and an installation manual. We can also arrange for an engineer to provide remote guidance during assembly.

    +
  • What certificates can you provide?

    We can provide material certificates, weld inspection reports, test reports, and all documents required for customs clearance.

    +
  • How long is the warranty period?

    We provide a 12-month warranty after shipment.

    +